Re: T1 control box and solar panels

Post by T1 Terry »

jon_d wrote: Mon Jul 19, 2021 8:42 am
I want to remove the 130w panels and replace them with 2 x lg neon 2 360 w panels.
Can that be done or do I need to change to a bigger dingo.
The LG panels are house panels and have a higher voltage and Maximum power points.

The DIngo (any size) is a PWM controller and they do not work effectively with house panels and their higher voltages..

You need to get a high quality MPPT controller.

If fitting just two high power good quality house panels; I would be installing a Victron 100/50 bluetooth and wire the panels in series.
https://www.victronenergy.com/solar-cha ... ppt-100-30


(How that interfaces with Terry's box, I do not know.)
Victron make a cable that plugs into the VE direct socket on the MPPT controller that require a voltage anywhere between 5v and 70v (again from a dodgy memory) for the controller to turn on, no voltage supplied to the cable and the controller stops charging ..... if you simply interrupt the solar input, the controller sends up a fault inquiry asking why the solar now has zero volts across the terminals ..... smart a*se little buggers .... the other thing is the pin spacing and position of the lock out tabs on the plug and slot in the socket appear to be proprietary, so multiple VE direct cables can't be linked together from a single cable/board ...... Well, unless you cheat a bit :lol:

T1 Terry
A person may fail many times, they only become a failure when they blame someone else John Burrows
Those who struggle to become a leader, rarely know a clear direction forward for anyone but themselves
User avatar
Greynomad
Posts: 9025
Joined: Tue Dec 04, 2012 4:16 pm
Location: Rutherglen, Vic.
Has thanked: 28 times
Been thanked: 61 times

Re: T1 control box and solar panels

Post by Greynomad »

T1 Terry wrote: Mon Jul 19, 2021 3:06 pm … so multiple VE direct cables can't be linked together from a single cable/board ...... Well, unless you cheat a bit :lol:

T1 Terry
T1,
How do you know that, Hmmmmm?? :?
Regards & God bless,
Ray
--
"Insufficient data for a meaningful answer."
Isaac Asimov, "The Last Question"

"I refuse to drink water, because of the disgusting things fish do in it"
W.C.Fields
User avatar
T1 Terry
Posts: 15963
Joined: Fri Nov 23, 2012 3:44 pm
Location: Mannum South Australia by the beautiful Murray River
Has thanked: 50 times
Been thanked: 30 times

Re: T1 control box and solar panels

Post by T1 Terry »

Greynomad wrote: Mon Jul 19, 2021 5:02 pm
T1 Terry wrote: Mon Jul 19, 2021 3:06 pm … so multiple VE direct cables can't be linked together from a single cable/board ...... Well, unless you cheat a bit :lol:

T1 Terry
T1,
How do you know that, Hmmmmm?? :?
Ummmm........ but it worked so ...... 8-)

T1 Terry
A person may fail many times, they only become a failure when they blame someone else John Burrows
Those who struggle to become a leader, rarely know a clear direction forward for anyone but themselves

Return to “Low Voltage Electrical”